Federal · 2023

Federal Operations Campus

A secure operations campus built to keep working through a blast, a storm or a lost utility feed.

Owner
Confidential
Location
U.S.
Market
Federal
Delivery
Design-build
Scale
260,000 SF
Completed
2023
The brief

A secure operations campus with blast-resistant envelope, redundant power and an on-site central plant.

The campus had to stay running under conditions most buildings never face. The envelope needed blast resistance, the power system needed redundancy at every level, and an on-site central plant had to carry the load if the utility could not. Every worker was badged, every delivery was screened, and design reviews ran through a security process of their own.

How we built it

The approach.

  1. 01

    Blast envelope by design-assist

    Precast panels, connections and glazing were engineered with the fabricators so the blast design was buildable the first time.

  2. 02

    Central plant first

    The plant was completed early and used to condition the building during finishes, proving it under real load.

  3. 03

    Redundant power, tested hard

    Dual utility feeds, generators and UPS were tested by pulling utility power and watching the campus carry on.

  4. 04

    Controlled site

    Badging, escorted deliveries and a screened laydown yard kept the site secure from the first day of earthwork.

The outcome.

260,000Square feet
2Independent utility feeds
1On-site central plant
100%Systems tested under simulated outage

“We did not hand over a building and hope. We pulled the power and showed them it kept running.”

Commissioning manager, MarkWester
Federal