Higher Education · 2023

University Science Center

Labs, research suites and a glass commons went from shifting program to finished building under one design-build contract.

Owner
Confidential
Location
U.S.
Market
Higher Education
Delivery
Design-build
Scale
148,000 SF
Completed
2023
The brief

Teaching labs, research suites and a glass-walled commons that put science on display for the whole campus.

The university hired the team while the lab program was still moving. Fume hoods, vibration-sensitive research suites and a glass-walled commons all had to share one structure without fighting each other. In a lab building the exhaust system sets the floor-to-floor height, so the mechanical design had to lead the architecture instead of following it.

How we built it

The approach.

  1. 01

    Program fixed early

    Working sessions with faculty settled lab modules, bench layouts and fume hood counts before the structural grid was drawn.

  2. 02

    A quiet floor for research

    Research suites sit on a stiffened slab zone, separated from the commons and the mechanical floors that would carry vibration.

  3. 03

    Clashes solved in the model

    Duct, lab waste, gas piping and cable tray were coordinated floor by floor in the model before the first hanger went in.

  4. 04

    Every hood tested

    Each fume hood was face-velocity tested and each lab air-balanced before faculty moved a single instrument.

The outcome.

148,000Square feet of labs and commons
1Contract for design and construction
100%Fume hoods tested before move-in
On dateOpen for the fall semester

“The scientists told us what the rooms had to do. We built the building around that answer.”

Preconstruction director, MarkWester
Higher Education