Performing Arts Center

An 1,800-seat concert hall floats inside its own shell, so the only sound in the room is the music.

Owner
Confidential
Location
U.S.
Market
Cultural & Performing Arts
Delivery
CM at-risk
Scale
1,800 seats
Completed
2025
The brief

A concert hall tuned to the decibel, with a box-in-box structure that keeps the river traffic outside.

The site sits beside a working river, with barge horns and engine noise that carry a long way over water. The acoustician called for a box-in-box structure, a concert hall resting on isolation bearings inside an outer building, with no rigid connection between the two. One stray bolt, conduit or pipe hanger bridging the gap would carry noise straight into the room.

How we built it

The approach.

  1. 01

    Mockups before the real thing

    Isolation bearings and wall assemblies were mocked up and tested early, so crews knew the details before they reached the hall.

  2. 02

    The gap was guarded

    Every penetration between inner box and outer shell used a flexible connection, and each one was inspected and logged.

  3. 03

    Quiet air

    Large, slow-moving ductwork and an under-seat supply plenum keep the mechanical system below the hall’s noise target.

  4. 04

    Measured, not assumed

    Background noise was measured in the empty hall and tuned with the acoustician before the first rehearsal.

The outcome.

1,800Seats
2Structures, one inside the other
0Rigid ties between hall and shell
On dateOpening night

“You cannot fix acoustics with paint. It had to be right in the steel, the concrete and every hanger in between.”

Superintendent, MarkWester